News and information for those involved in Resource Management issues
    If the Centre can help you in any of these areas - contact us
    The Centre's Activities include:
  • Making submissions on Proposed Planning Documents
  • Dealing with Councils
  • Promoting research
  • Providing expert advice and witnesses
  • Lectures, seminars and training sessions
  • Comment in local newsmedia
  • Examples of submissions on Planning Documents
  • Commentary on current issues
  • Responding to Government Reports and initiatives

Contact Us:
Owen McShane
Director


Centre for Resource
Management Studies

1104 Oneriri Road
R.D. 2
Kaiwaka
Northland
0573
New Zealand
Phone: 64 9 431 2775
Fax: 64 9 431 2775

Mobile: 0274 767 814

To Support Us:
Please Donate
Hits:
Why Tunnels? PDF Print E-mail
Centre Digests
The Highway Action Trust asked the Centre to prepare a submission to Transit New 
Zealand challenging the decision to construct the Waterview
connection, the final link in the Western Motorway route as Driven Tunnels
rather than the more cost effective "at-grade" option.

The Centre prepared a full submission which can be viewed at our Centre website .
 If by the time you look it has moved from the front page just 
enter Waterview in the "search" slot.

We believe the full submission is worth reading for anyone interested in the
strange decision making process now dominating Transit New Zealand.
However, we were then asked to prepare a "short form" of the submission in the
form of "Five questions which must be answered".

The five questions are:


Question One

· Why does Transit New Zealand favour the proposed Driven Tunnel Option
through Mt Albert, even though it comprehensively fails to address the amenity,
mobility and efficiency requirements of the general motoring public, who will
actually pay for the project, and make most use of it?


Question Two

· Why has Transit New Zealand not even considered the option of an at-grade
motorway through Mt Albert, similar to that now being built through Mt Roskill,
and which would cost only a fraction of the Driven Tunnel Option?


Question Three

· Why does Transit New Zealand favour a Driven Tunnel Option which cannot
readily adapt to future growth in demand by adding lanes, by adding future
connections, and which closes off the option of a second harbour bridge joining
Pt Chevalier to the North Shore?


Question Four

· Why, for such a critical link in the road network, does Transit New
Zealand favour a Driven Tunnel Option which is highly vulnerable to future
natural disasters,(such as earthquake, volcanos and tsunami) and is also prone
to frequent closure because of accidents or breakdowns, which are likely to
cause injury and death?**


Question Five

. Why has Transit abandoned the at-grade solution, which was their preferred
option up until 2000?”


Of course the underlying question is, "Why is Mt Albert so different from Mt
Roskill?"
There are no prizes for getting the right answer.

This decision is bad enough, but you will see from the attached supporting
material that the choice of tunnels closes off the option of a bridge at Pt
Chevalier, and hence dictates the decision to build the next set of crossings
next to the existing harbour bridge. Such a proposal keeps funneling traffic
onto spaghetti junction rather than developing a direct high grade motorway
connection between Hamilton and Whangarei.

Such a regional highway would avoid central Auckland and hence promote growth
and development in the north, west and south.

The central planners just keep driving those nails into the Auckland regional
coffin.

Those of you who live outside Auckland might like to think what that extra $1
billion or so, spent on a tunnel in Mt Albert, could do to improve your own
highways.

The html and pdf – both the same- documents filed on this website in Issues-Transport
 include some back-up commentary to explain what is going on.
 